Documents & Reports
Project #PTR-2026-047 · 1247 Maple Drive
12
Total Files
3
New This Week
5
Ready to Download
2
Require Signature
Roof Inspection Report — Apr 14, 2026
Inspection
PDF · 4.2 MB · Added Apr 14
Drone Survey — Hail Damage Photos (34 images)
Inspection
ZIP · 87 MB · Added Apr 14
Xactimate Scope of Loss — Claim #INS-881-4427
Insurance
PDF · 2.8 MB · Added Apr 16
Adjuster Meeting Notes & Approval Letter
Insurance
PDF · 1.1 MB · Added Apr 21
Signature Required
Project Estimate — Itemized Breakdown
Estimate
PDF · 890 KB · Added Apr 25
Signature Required
Material List — Owens Corning Duration Series
Estimate
PDF · 560 KB · Added Apr 25
Before Photos — Hail Impact Documentation (22 images)
Photos
ZIP · 48 MB · Added Apr 14
In-Progress: Tear-Off & Deck Inspection Photos (16 images)
Photos
ZIP · 29 MB · Added Today
New
Manufacturer Warranty — Owens Corning 25-Year Certificate
Warranty
Pending · Available at project completion
Workmanship Warranty — Peak Time Roofing
Warranty
Pending · Available at project completion
No documents match your search.